This fast-track project had a deadline issue to allow the customer’s products to reach the market first. A lot of temporary measures and phasing had to be implemented to achieve this goal. Surface and groundwater treatment under site conditions vs. neighbouring sites. Construction of unconventional concrete structures. (High-precision foundations for corridor bearing walls for the rolling composting equipment system ((3/8th of an inch allowance over 350’ length)), complex concrete slabs allowing leachate drainage). Management and coordination of a complex industrial process integration. Unconventional mechanical work. (Complex process, water treatment and filtration system, water basin system for drinking water and fire protection) Construction of a 5,000-amp electrical substation.